The paper briefly introduces the construction process,quality control and settlement detection technique of settlement control composite pile at F1 autodrome.
There are vast non-consolidated alluvia deposits freshly formed in estuary area of Yangtze River and nearby coastal area.The deposits contribute to land subsidence.
The inner parts of the drying tower and alkali subsider were reformed with the surf ace-treated regular plastic packing and the results are satisfactory.
A new type of automatic apocatharsis valve on settling centrifuge device was designed,so that the separation and automatic apocatharsis of the liquid and suspended substance were done continuously.
It has found reasonable ways brought roadbed to resultant stabilization owning to synthesize many factors such as earthiness,hydroclimate,wheather etc to find self weight and external load of roadbed.
Abstract: The deposition characteristics of diesel engine particles under the effect of thermophoresis force in cooling tube have been studied by the method of parameter analysis in this paper.
The state point analysis can be used in the design and operation analysis of the activated sludge system as the RAS ratio, overflow rate and settling characteristics of flocci are varying.