Don't worry about the heavy load, it's chained down.
别担心装
量大, 它已经用链子拴住了。
Don't worry about the heavy load, it's chained down.
别担心装
量大, 它已经用链子拴住了。
This is a circuil plan of secondhand radiodetector truck lade weight with ultrasonic geodesic.Circuil structural is simple.
给出一种利用超声波测

间接测量汽车装
量的电路
案。
25.You should advise us by cable, 12 days before the date of loading, name of ship, expected laydays, loading capacity, contract number and the shipping agents.
25、你们应在船只受
期二天前,将船名、预计受
日期、装
量、合同号码、船

人电报通知我们。
声明:以上例句、词性分类均由互联网资源自动生成,部分未经过人工审核,其表达内容亦不
表本软件的观点;若发现问题,欢迎向我们指正。