Don't worry about the heavy load, it's chained down.
别担心装量大, 它已经用链子拴住了。
Don't worry about the heavy load, it's chained down.
别担心装量大, 它已经用链子拴住了。
This is a circuil plan of secondhand radiodetector truck lade weight with ultrasonic geodesic.Circuil structural is simple.
给出一种利用超声波测距式间接测量汽车装量的路案。
25.You should advise us by cable, 12 days before the date of loading, name of ship, expected laydays, loading capacity, contract number and the shipping agents.
25、你们应在船只期二天前,将船名、预日期、装量、合同号码、船舶代理人报通知我们。
声明:以上例句、词性分类均由互联网资源自动生成,部分未经过人工审核,其表达内容亦不代表本软件的观点;若发现问题,欢迎向我们指正。