Anyway, after Simon has finished prepping the seabed, those caissons are transported over by tugboat and lowered, starting at the south side of the island.
Meanwhile, pre-construction dredging gets underway at the site location, before another ship lays the foundations for the caissons to lie on around the perimeter of the island.