1.Make of polyethylene(pe)sheets of filmtreated with a layer of non-out gassing. Pressure sensitive adhesive. Removes dirty and contamination from shoes in cleanroom entrways, gowning areas, etc.
2.This sealed plastic wafer carrier is transported around the cleanroom floor using an overhead transport system which lowers the foup onto the tool's landing pad.
3.On the cleanroom floor there are a total of 435 semiconductor tools resulting in the fab's production capacity of 50,000 wafers or 11.5 million CPUs a month.
4.Whereas the second is how the semiconductor fab and multimillion dollar equipment on the cleanroom floor work, and we'll be flipping between these two sides to get a complete picture.