1.Ground overloading changes the stress state of the existing stratum and causes stress release by the soil, thus resulting in the nonuniform settlement deformation of the existing tunnel.
2.Figure 10 shows that the longitudinal settlement of the tunnel vault in case 1 increases slightly after surface hardening, but the nonuniform settlement of the tunnel vault has been greatly improved.