2.With regard to the leakiness and the formation’s low bearing pressure ability of Jiulongshan structure, various leak stoppage plans were experimented.
4.TPCO Iron-making Subsidiary adopts a stoppage method of dropping the stock level with vacant stockline to expose the staves inside the blast furnace in order to replace the damaged ones.