BDMP(Bridge Design Method and Process) was created in 2007.We mainly concentrate in the research of Life-Cycle Design, Risk Evaluation, Wind-resistance Analysis and Bridge Aesthesis Design.
The prestressed concrete continuous rigid frame bridge is widely used because of its high strength, lightful line type, convenient and fast construction, long-span ability.
The mission of this article is to simplely design the bridge automation monitorial and control system inorder to establish a basis for the future design.