Coal mine rockbolt shoring current situation,necessity and significance having discussed rockbolt shoring parameter optimization design combining with leaping forward.
Accoording to the result on observation of rock pressure,adaptability of telescopiform bolt in soft rock road and reasonable structural parameter are analysed.
After several years to jumbolter research,the hard rocks always present in the soft ones in the wall rock procedure using jumbolter,which results in changing the boring tool during the procedure.
The shield tunnel at these positions is generally prone to fracturing and breakage, resulting in differential settlement, joint seepage, bolt fracture and segment cracking.