有奖纠错
| 划词

As a result, it is widely used in many fields such as mining industry, forest industry, dock, ferry, bridgework, water and power engineering.

因而,它被广泛应用于采矿业、业、头、渡口梁、水电建筑程的起重和施作业中。

评价该例句:好评差评指正

用户正在搜索


BLN, bloat, bloated, bloatedness, bloater, bloating, blob, blobberlipped, blobber-lipped, blobby,

相似单词


3G, 401(K), a,

声明:以上例句、词性分类均由互联网资源自动生成,部分未经过人工审核,其表达内容亦不代表本软件的观点;若发现问题,欢迎向我们指正。

漫长的告

" One more crack and you'll need new bridgework" .

裂缝一次, 你将需要新的桥梁工程” 。

评价该例句:好评差评指正
2015 ESLPod

One day, it's cavities and crowns, and the next, extractions, bridgework, dentures, implants, and inlays.

有一天,它是蛀牙和牙冠,接下来是拔牙、牙桥、假牙、植入物和镶嵌物。

评价该例句:好评差评指正
TED演讲(版) 20187月合集

Bridgework can look crazy or cool depending on how you were rolling when your personal financial crisis hit.

桥梁工程可能看起来很疯狂或很酷,具体取决于您在个人财务危机来袭时的表现。

评价该例句:好评差评指正
TED演讲(版) 20187月合集

We're in the middle of a seismic shift, and we're going to have to find bridgework to get us through.

我们正处于一场巨变之中,我们将不得不寻找桥梁让我们渡过难关。

评价该例句:好评差评指正
2015 ESLPod

She says, " One day its cavities and crowns, and the next extractions, bridgework, dentures, implants, and inlays." There's a lot of specialized vocabulary in that sentence.

她说,“有一天是蛀牙和牙冠, 接下来是拔牙、牙桥、假牙、植入物和镶嵌物。” 这句话中有很多专业词汇。

评价该例句:好评差评指正

用户正在搜索


block letter, block out, blockade, blockader, blockade-runner, blockage, blockboard, blockbuster, blockbusting, block-condenser,

相似单词


3G, 401(K), a,
  • 微信二维码

    关注我们的微信

  • 手机客户端二维码

    下载手机客户端

赞助商链接