According to the problems of WZ-C bell-less top charging equipment such as high temperature and perviousness of distributor.The causes are analyzed.The water cooling and block system are modified.
针WZ-C无料钟顶装料设备存在的布料器温度、透水等问题进行了原分析,并进行水冷、水封系统改进。
声明:以上例句、词性分类均由互联网资源自动生成,部分未经过人工审核,其表达内容亦不代表本软件的观点;若发现问题,欢迎向我们指正。