Indeed, while inflation remained tamed in 2005 and 2006, the price deflator for nonresidential construction, which measures construction costs, rose 11.7% in both years.
The respirometric activities of sludge before and after tame have been determined by the BOD Track, and the activity could be expressed by first slope of respirometric curve.