The basic principle is the VCA formed by the coarse aggregate is filled with the fine aggregate, the filling, the asphalt and the preconcerted void content.
Another way to reduce the impact of high winds on tall buildings is to increase their porosity - " cutting out" parts out of the structure and allowing air to flow through, as well as around the building mass.