Counterfort retaining walls are optimized in the paper, using the optimum program, costs of different counterfort retaining wall parameters were calculated and based on the contrast analysis.
本文对挡土墙进行优化计算,利用优化计程序对不同参数下的截面状程造价进行分析比较。
声明:以上例句、词性分类均由互联网资源自动生成,部分未经过人工审核,其表达内容亦不代表本软件的观点;若发现问题,欢迎向我们指正。