It deals with lots of factors from the process of networks modeling, node demand calculation, initial flow distribution, and the optimal design to the drawing of pipe networks and isopiestic line.
文章别论述了管网优化计算、管网图形和等压线图方法。
声明:以上例句、词性分类均由互联网资源自动生成,部分未经过人工审核,其表达内容亦不代表本软件的观点;若发现问题,欢迎向我们指正。
关注我们的微信
下载手机客户端
划词翻译
详细解释