Give priority to develop and manufacture full-face excavator, large-tonnage hydraulic excavator, heavy-tonnage loader, autocrane series, medium and small tonnage and multifunctional loaders.
25.You should advise us by cable, 12 days before the date of loading, name of ship, expected laydays, loading capacity, contract number and the shipping agents.
Gordon have demonstrated that mechanical loading of skeletal muscle will induce activation of FAC signaling, as determined by changes in the phosphorylation status of FAK or paxillin.
The Buyers shall advise the Sellers by cable, 12 days before the expected loading date, of the estimated laydays, contract number, name of vessel, quantity, to be loaded and shipping agent.