The paper briefly introduces the construction process,quality control and settlement detection technique of settlement control composite pile at F1 autodrome.
Accoording to the result on observation of rock pressure,adaptability of telescopiform bolt in soft rock road and reasonable structural parameter are analysed.
The project department monitors and controls the whole process of breakwater enrockment costruction by field observing instruments buried in sand soft nappe.
Abstract: In the paper, by integrative using GIS and Geostatistics, we analyzed the special distribution characteristic of groundwater downrange in arid area.
This observation is consistent with comments and observations of earlier investigators who indicated zoning features such as quartz masses, petalite zons and mica selvages.