With load growth of distribution systems, it becomes very complicated for dispatchers to obtain restoration plan for unfaulted but out-of-service areas.
The paper intrduces the exchange CENTREX, dispatching equipment and the com-bination of them, and puts forward the methods of improving coalmining communication capabili-ty.
A new multiqueue method with variable priority is presented to solve the real time dynamic scheduling problem of automatic transportation system in flexible electrophoresis production line.
This has the vital significance to catch on the kernel layer of operating system, to dialyse process principle, to discover and study the new Scheduling Algorithm.