The author introducd the electric equipment design of ore smelting eutecticum engineering of ore sintering plate, stated the problemes and the countermeasures.
In June1957, forging and coldworking workshops equipped with metal processing capability were established, and the plant began to repair and build barge, repair steamer steering gear and windlass.
In the paper,I use the first and especially the second law to analyse the thermal system for the calibration results of energy balance and exergic balance in No.
Later, the shoe in the factory sells do not go out, stopped to produce, I placed a vendor's stand in factory doorway with respect to the cully with the workshop.