The Northern Section of the Tai Lam Tunnel extends from Chainage 18+212 to 21+518, as shown on Figure A.
如图A所示,大榄隧道北段链距由18+212延展至21+518。
The Northern Section of the Tai Lam Tunnel extends from Chainage 18+212 to 21+518, as shown on Figure A.
如图A所示,大榄隧道北段链距由18+212延展至21+518。
The applied Q sign in the "Discharge"- or "Q-dH-curve"- fields controls the pump direction (with or against chainage).
设置了以后,当操作时,从此位置总共向游的总的也即的出。
明:以上例句、词性分类均由互联网资源自动生成,部分未经过人工审核,其表达内容亦不代表本软件的观点;若发现问题,欢迎向我们指正。