25.You should advise us by cable, 12 days before the date of loading, name of ship, expected laydays, loading capacity, contract number and the shipping agents.
25、你应在只受天前,将名、预计受日、装量、合同号码、理人电报通知我。
25.You should advise us by cable, 12 days before the date of loading, name of ship, expected laydays, loading capacity, contract number and the shipping agents.
25、你应在只受天前,将名、预计受日、装量、合同号码、理人电报通知我。
The Buyers shall advise the Sellers by cable, 12 days before the expected loading date, of the estimated laydays, contract number, name of vessel, quantity, to be loaded and shipping agent.
买方应在只受12天前将名、预计受日、装数量、合同号码、理人,以电报通知卖方。
声明:以上例句、词性分类均由互联网资源自动生成,部分未经过人工审核,其表达内容亦不表本软件的观点;若发现问题,欢迎向我指正。