In this paper, The plan of stage diversion by contraction river bed in the construction of dam body of Baisa Reservior is introduced.
摘要文章介绍在白河水库体工程施工中,采用束窄河床方式分期导流的方案。
In this paper, The plan of stage diversion by contraction river bed in the construction of dam body of Baisa Reservior is introduced.
摘要文章介绍在白河水库体工程施工中,采用束窄河床方式分期导流的方案。
声:例句、词性分类均由互联网资源自动生成,部分未经过人工审核,其表达内容亦不代表本软件的观点;若发现问题,欢迎向我们指正。