5.The building was destroyed when the defective boiler exploded.
那个有毛病的爆炸时,那座楼被炸毁了。
6.A plumber’s coming in to look at the boiler.
有位水暖工要来看看热水器。
7.This new boiler generates more heat than the old one.
这个新产生的热量比旧多。
8.This water is forced into the boiler by the feed pump.
用水泵将水压入。
9.The engine is letting off steam to relieve the pressure in the boiler.
机车在放蒸汽, 以减少的气压。
10.Extruded magnesium anode are mainly used inwaterboiler,heatexchanger,vapourater,boiler,etc.lt has pro-perty of softingwater,de-dirtresidual,enlong the usinglife,span.
挤压镁阳极主要应用于热水器、换热器、蒸发器、等设备,有软化水质、排污除污、延长主机使用寿命等优点。
11.In order to save space, the back of the boiler had been let into the wall.
为了节省空间, 的背部被嵌进墙内。
12.The control system will automatically transfer to this mode in the mode in the event of a boiler runback.
一旦自动减负荷时,该控制系统将会自动地切换到这一汽轮机跟随方。
13.The harnessing of noise and smust to boiler are studied,pugging and ventilation are adopted to harnest noise of fan.
14.The technigue of staged coal combustion in underplate burning boiler is a mew method for energy saving and environment protecting.
层燃两段燃烧技术,是一种行之有效的节能、环保的新技术。
15.E—M water treatment agent for boilers,composed of ethylenediamine tetramethylene phosphonic acid(EDTMP) and hydrolyzed polymaleic anhydride (HPMA),and its applications are introduced in this article.
16.Distorsion,corrosion,erosion and abrasion mechanisms,concerning the faulty section,of the boiler s secondary superheater were studied by on-site measurements and by samples,cut from the tubes.
17.Bench of closed circuit cooling tower that is composed of boiler ,exchanger, orifice flowmeter, water pump, micromanometer , heat indicator and so on is established.
建立了由、换热器、孔板流量计、水泵、微压计、温度计等仪器设备组成的封闭冷却塔实验台。
18.A new turbine-boiler coordination control system is designed for the 600 MW supercritical monotube boiler manufactured by Haerbin Boiler Plant with British Mitsm Babcock technology.
针对哈尔滨厂引进英国三井巴布科克技术制造的600 MW超临界直流,设计了新型的机协调控制系统。
19.The tube leakage of partition overheater of No. 2 boiler in a power plant was studied by means of metallography, intergranular corrosion test and EDS.
摘要针对日照电厂2(上标﹟)屏过热器泄漏进行了金相试验、晶间腐蚀倾向性试验和电镜能谱分析。
20.Through usual and unusual analysis on using meager coal as fuel for bitumite-fired boiler,the innovation plan was made and corresponding modification of the boiler was carried out.