The paving process of asphalt paver and the action between mixture and screed are analyzed in order to solve the problems in kinematics model of screeding unit.
为了解决沥土铺机熨平装置运动学模型存在的问题,析了铺机的铺过程以及合料与熨平板之间的作用关系。
The paving process of asphalt paver and the action between mixture and screed are analyzed in order to solve the problems in kinematics model of screeding unit.
为了解决沥土铺机熨平装置运动学模型存在的问题,析了铺机的铺过程以及合料与熨平板之间的作用关系。
声明:以上例句、词类均由互联网资源自动生成,部未经过人工审核,其表达内容亦不代表本软件的观点;若发现问题,欢迎向我们指正。