1.After the discrete model of MLI has been built, the dynamic programming was applied to develop the suboptimum algorithm to achieve the optimum aim.
了算法中参数选择对误差影响,对算法复杂度分析表明其与优化问题规模增长是一阶关系。
2.The constructed solving process is to establish a general SBR model firstly, then to derive the suboptimum solution by trial and error method with the help of simulation tools.