The problem is accentuated by a shortage of water and electricity.
缺乏水电使问题愈加严重。
The problem is accentuated by a shortage of water and electricity.
缺乏水电使问题愈加严重。
The potential of hydroelectricity of one region varies from that of another.
水电的潜力因地而异。
The experimental farm is near the waterpower station.
实验农场在水电站附近。
People came in flocks to see the new hydraulic power station beside the dam.
人们成群结队地来参观水坝旁边新建的水电站。
Riverain grounding network and conductive cement are proposed for riverain station.
对河边变电所和水电站,提出设置河岸接地网或用导电水泥降阻的方案。
This paper gives a presentation of the surge tower type forebay design of Jinfeng Hydroelectric Power Station.
介绍了金凤水电站调压塔前池的结。
'The negative impacts of overdevelopment of hydropower would destroy the river's diverse aquatic life,' the letter said.
,水电过度发将会破坏长江水生生物的多样性。
The effect of blasting load on anchored birder is a hot research issue in disaster prevention and mitigation of hydroelectricity project.
爆破荷载对锚固梁作用的研究是水电工程防灾减灾的一个热点问题。
As a result, it is widely used in many fields such as mining industry, forest industry, dock, ferry, bridgework, water and power engineering.
因而,它被广泛应用于采矿工业、森林工业、码头、渡口以及桥梁、水电建筑工程的起重和施工作业中。
So, as the complement for the bimaceral polyurea, the single-polyurea has the wide application foreground in the anti-crash and anti-seepage in the hydropower project.
作为双组分聚脲施工技术的补充,单组分聚脲在水利水电工程中混凝土抗冲磨及防渗等方面具有广泛的应用前景。
The research is according to the underset energy dissipation problem of the release works in xianmi hydropower station in Xianmi village, Men Yuan county, Qinghai province.
本研究是针对青海省门源县仙米乡仙米水电站泄水建筑物的底流消能问题进行的。
声明:以上例句、词性分类均由互联网资源自动生成,部分未经过人工审核,其表达内容亦不代表本软件的观点;若发现问题,欢迎向我们指正。