The basic principle is the VCA formed by the coarse aggregate is filled with the fine aggregate, the filling, the asphalt and the preconcerted void content.
矿料级配中粗集料形隙率由细集料、料、沥青和预定隙率充。
The basic principle is the VCA formed by the coarse aggregate is filled with the fine aggregate, the filling, the asphalt and the preconcerted void content.
矿料级配中粗集料形隙率由细集料、料、沥青和预定隙率充。
声明:以上例句、词性分类均由互联网动生,部分未经过人工审核,其表达内容亦不代表本软件观点;若发现问题,欢迎向我们指正。