The terminal was constructed of reinforced concrete.
这个终点站是用筋泥建造的。
The terminal was constructed of reinforced concrete.
这个终点站是用筋泥建造的。
It is hard to prevent concrete from creeping.
很难泥变形。
There was nothing newsy, few concrete details of anything.
没有什么夸张的新闻,谈论的任何事都缺少具体细节。
I do not regard the constitution as set in concrete.
我不认为宪法是不可变更的。
Everywhere you look,you can see glass and concrete monstrosities going up.
到处你都能看到玻璃和混土的庞然大物拔地而起。
This kind of concrete sets quickly.
这种混土得很快。
Though the analysis of the concrete track crosstie dehiscence, a new maintaining method is provided.
介绍了混土轨枕伤损的类型及其原因,并推出了一种适合混土轨枕线路特点的养护作业方法。
I haven't got any concrete proof.
我没有任何确实的证据。
I am a mechanician.(electrician, Pipelayer,welder, carpenter, turner, blacksmith, builder, erector, riveter,rigger, concrete worker, engine-driver,repair worker).
我是一个机械工。(电工、管工、焊工、木工、车工、铁工、建筑工人、安装工人、铆工、起重工、混土工、司机、维修工)。
The concrete road congealed.
混土路面了。
All actual objects are concrete.
一切实际存在的物体都是具体的。
Glass fiber is used to reinforce material for increasing toughness, flexural strength, and tensibility in unsaturated polymer modified concrete.
玻璃纤维则是作为强化材,以增加泥浆体的韧性及抗弯、抗拉等机械性质。
The experimental result of imperviousness of asphalt concrete under various load levels is presented in this paper.
本试验侧重于沥青混土的渗性能研究。
By exampling, it is posepole that quantitative counting and qualitative reviewing durable resistance about liquid corrosion on concrete.
通过算例表明定量计算、定性评价混土在液相腐蚀下的耐久性是可能的。
Based on screening and sampling,properties of trass and trass concrete in Ximeng area of Inner Mongolia was studied.
通过筛分选样,对内蒙古锡盟地区大量蕴藏的火山渣及火山渣混土进行了材料性能实验研究。
This paper introduces the actual operating course of the truss hoisting with herringbone rotating longeron supported by concrete frame.
介绍了利用砼框架支撑人字转动桅杆吊装桁架的实际操作过程。
What are put down by us are not only bricks, stones, steel, concrete and limbers, but culture as well.
除了文化,就是这些文化的载体,也在推土机的烟尘中消散殆尽了。
The failure process of fiber concrete is: elastic stage, crack stage, crack development stage and fracturation stage.
相应的纤维混土断裂过程包括:弹性阶段、开裂阶段、裂缝发展阶段、断裂阶段。
Abstract: The coactions of subsealing concrete and steel pipe pile are the key technology of large steel suspension-box cofferdam.
封底混土与护筒的共同作用是大型吊箱及承台设计与施工的关键技术问题。
Elaborated in the cadastration the boundary point, the object point concrete measuring technique and the office work processing general process.
阐述了地籍测量中界址点、地物点的具体测量方法和内业处理的一般过程。
声明:以上例句、词性分类均由互联网资源自动生成,部分未经过人工审核,其表达内容亦不代表本软件的观点;若发现问题,欢迎向我们指正。