While conducting hydraulic fracturing, the flow rate is required to be controlled to enable the hall-off to block off and uncord the eyelet based on the stimulation process.
封堵球分层,为了使暂堵球按照施工泵注程序对射孔孔眼进行封堵和解封,需要对施工的泵注排量提出要求。
While conducting hydraulic fracturing, the flow rate is required to be controlled to enable the hall-off to block off and uncord the eyelet based on the stimulation process.
封堵球分层,为了使暂堵球按照施工泵注程序对射孔孔眼进行封堵和解封,需要对施工的泵注排量提出要求。
声明:以上例句、词性分类均由互联网资源自动,分未经过人工审核,其表达内容亦不代表本软件的观点;若发现问题,欢迎向我们指正。