Based on homothetic triangle theory,a new height computation method of pile type brige pier and ribbed plate type abutment post is introduced.
文章以一种新的思维方式-相似三角形原理计算桩柱式墩、肋板式柱(肋板)顶高程。
Based on homothetic triangle theory,a new height computation method of pile type brige pier and ribbed plate type abutment post is introduced.
文章以一种新的思维方式-相似三角形原理计算桩柱式墩、肋板式柱(肋板)顶高程。
Based on homothetic triangle theory, a new height computation method of pile type brige pier and ribbed plate type abutment post is introduced.
摘要文章以一种新的思维方式-相似三角形原理计算桩柱式墩、肋板式柱(肋板)顶高程。
For lack of the theoretical calculation method at present,the skew bridge backwater is simulated in adopting circle pier and embank uncompressing river through hydraulic models.
梁建设多在天然河道进行,当墩阻水面积占河道过水面积的比较小时,可以不考虑墩壅水影响。
With descending of the main pier s foundation slab and integral moving of pier,not only the navigable dimensions meet the demand,but also the influence on upbound ships is very li.
通过下降主墩承体北移墩,使通航尺度达到要求,且对船舶上行影响极小。
声明:以上、词性分类均由互联网资源自动生成,部分未经过人工审核,其表达内容亦不代表本软件的观点;若发现问题,欢迎向我们指正。