When installation, unlade the join copper bus bar, through the preformed long-square hole, fixing it on the main grounding bus bar.
安装时将互连铜排卸下,穿越柜间预留的,固定在相邻两柜的主接地铜排上。
When installation, unlade the join copper bus bar, through the preformed long-square hole, fixing it on the main grounding bus bar.
安装时将互连铜排卸下,穿越柜间预留的,固定在相邻两柜的主接地铜排上。
The southern part of Siu Chik Cha has also been formed and is earmarked for a depot for Tseung Kwan O Mass Transit Railway and Composite Development Area.
小赤沙南部也已平整,并预留作将军澳地下铁路车厂及合发展区之用。
Beam side form shall be installed after all work inspected and accepted such as beam rebar work, cushion block laying, steel inserts installation, steel doweling and pocket molding bed, etc.
绑扎梁筋,垫保护层垫块,安放埋件、插筋、预留胎等,经检查合格后扣梁侧。
:以上例句、词性分类均由互联网资源自动生成,部分未经过人工审核,其表达内容亦不代表本软件的观点;若发现问题,欢迎向我们指正。