The auxiliary shaft topsoil adopted ordinary construction and drainages in hygrometric well.
屯留煤矿副井井筒表土
采用普通法施工,利用井外降水井疏干降水。
);
(
)The auxiliary shaft topsoil adopted ordinary construction and drainages in hygrometric well.
屯留煤矿副井井筒表土
采用普通法施工,利用井外降水井疏干降水。
The topsoil has been almost completely washed away.
表
土壤已差不多完全给冲走了。
Effect of nutrient management on selected topsoil characteristics of a basalt derived Ferralsol in Dak lak ,Vietnam.
表5 养分管理对达拉克(Daklak)一种玄武岩发育
铁铝土基本些表土
性

响 Table 5.
声明:以上例句、词性分类均由互联网资源自动生成,部分未经过人工审核,其表达内容亦不代表本软件
观点;若发现问题,欢迎向我们指正。