Minish the well space and increase transflux routeways upper backwater and driving, especially setup precipitation well and drain residual water at the bottom of diving layer.
减小间距,增加上层滞和入流通道,尤其要在含层底板低洼处设置降将低洼处残留引走。
Minish the well space and increase transflux routeways upper backwater and driving, especially setup precipitation well and drain residual water at the bottom of diving layer.
减小间距,增加上层滞和入流通道,尤其要在含层底板低洼处设置降将低洼处残留引走。
声明:以上例句、词性分类均由资源自动生成,部分未经过人工审核,其表达内容亦不代表本软件观点;若发现问题,欢迎向我们指正。