According to the problems of WZ-C bell-less top charging equipment such as high temperature and perviousness of distributor.The causes are analyzed.The water cooling and block system are modified.
针对高炉WZ-C无料钟炉顶装料在的布料器温度高、透水等问题进行了原因分析,并进行水、水封系统改进。
According to the problems of WZ-C bell-less top charging equipment such as high temperature and perviousness of distributor.The causes are analyzed.The water cooling and block system are modified.
针对高炉WZ-C无料钟炉顶装料在的布料器温度高、透水等问题进行了原因分析,并进行水、水封系统改进。
声明:以上例句、词性分类均由互联网资源自,部分未经过人工审核,其表达内容亦不代表本软件的观点;若发现问题,欢迎向我们指正。